Manufacturing Production Planning System in Excel (card 1 of 2)

Revision card 1 for Manufacturing Production Planning System in Excel: Planned finish date: =WORKDAY.INTL(F5,I5-1,11) gives 06-10-2026; Machine hours per day: =B10*$B$4*$B$5 gives 13.6; Order number: ="SO-"&(100+ROW()-4) gives SO-101. Includes an example data table.

Revision card 1 for Manufacturing Production Planning System in Excel: Planned finish date: =WORKDAY.INTL(F5,I5-1,11) gives 06-10-2026; Machine hours per day: =B10*$B$4*$B$5 gives 13.6; Order number: ="SO-"&(100+ROW()-4) gives SO-101. Includes an example data table.
Card 1 of 2: Manufacturing Production Planning System in Excel · Download PNG
Read card text

What this card says

1 for Manufacturing Production Planning System in Excel: Planned finish date: =WORKDAY.INTL(F5,I5-1,11) gives 06-10-2026

Machine hours per day: =B10*$B$4*$B$5 gives 13.6

Order number: ="SO-"&(100+ROW()-4) gives SO-101. Includes an

Example

data table

Learn this in the lesson: Manufacturing Production Planning System in Excel: Machine Hours, Planned Finish Date, Progress, Rejects and Machine Load